A 25kg bag of ready-mix produces roughly 0.012 cubic metres of wet concrete — around 12 litres. A cubic metre therefore needs something like 80 to 90 bags.
People consistently underestimate this, because the bag is heavy and the yield is not intuitive.
Above about half a cubic metre, mixing by bag stops making sense on both cost and effort. That is roughly the point where ready-mix delivery becomes cheaper as well as easier.
| Use | Mix (cement : sand : aggregate) | Note |
|---|---|---|
| General purpose slab | 1 : 2 : 4 | Paths, bases, general |
| Foundations, footings | 1 : 2.5 : 3.5 | Structural |
| Heavy duty, driveways | 1 : 1.5 : 3 | Higher strength |
| Post setting | 1 : 2 : 4 or postcrete | Postcrete is faster |
| Mortar (not concrete) | 1 : 4 cement : sand | Bricklaying |
Ratios are by volume, not weight, and water is deliberately absent — it is added to workability rather than to a ratio. More water makes concrete easier to place and measurably weaker, which is the most common way a home-mixed pour ends up under strength.
Add roughly 5 to 10%. Sub-base is never perfectly level, formwork bows slightly under the weight, and some is always lost in handling.
Running short mid-pour is a genuine problem: a cold joint between the first pour and a later top-up is a structural weakness and a visible line.
For post holes the usual guide is a hole three times the post width and a depth of about a third of the post height above ground, which this tool uses as its default.
Roughly 80 to 90 bags of 25kg ready-mix, since each yields only about 12 litres. Above half a cubic metre, ready-mix delivery is usually cheaper as well as easier.
1:2:4 cement, sand and aggregate for general slabs and paths; 1:2.5:3.5 for footings; 1:1.5:3 for driveways. Ratios are by volume, not weight.
5 to 10%. Sub-base is never perfectly level and formwork bows under the load. Running short creates a cold joint, which is both a weakness and a visible line.
A common guide is a hole three times the post width, at a depth of about a third of the post height above ground — so a 2m fence post needs roughly 600mm in the ground.
Yes, measurably. Extra water makes it easier to place and lowers the final strength, which is the most common way a home-mixed pour ends up weaker than intended.